400 S La Salle St
400 S La Salle St · Chicago, IL, 60605
Active elevator equipment · 5 permits
ACTIVE
PERMIT SET
ELEVATOR EQUIPMENTELEVATOR
Largest permit
$51.1M
Window
Jun 25, 2026 – Aug 12, 2026
Permits
5
Parties
13
Largest single reported permit cost — not a summed project total. Individual permit values can overlap in scope.
Sign up to save projects and keep browsing past the free preview limit.
Activity
How much relevant permit activity is on this site.
89
/ 100
High
Why this score:
Recent permit activity
Related permit history
Major construction activity
Active permits on site
Multiple trades involved
Significant reported costs
Trade fit
How well this project matches each trade, from linked permits. Select a trade to filter parties & permits.
| Trade | Fit | Evidence |
|---|---|---|
| High | Major construction permits | |
| Medium | Supporting construction permits | |
| Low | Major construction permits |
Permit ledger
All 5 permits on this record| Permit | Description | Status | Contractor | ||
|---|---|---|---|---|---|
101087166 Elevator Equipment · Elevator | Modernize one 10,000lb freight elevator serving 8 floors. | AUG 12, 2026 | — | $1,419,751 | Kone Elevator Company |
B200476121 Electrical Work | LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 4 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: GROUND FLOOR EXTERIOR UNDER THE EXISTING BREEZEWAY. | JUN 24, 2026 | Active | $120,000 | Abco Electrical Construction & Design LLC |
B200475301 Electrical Work | LINE VOLTAGE ELECTRICAL WORK. ADD 80 CIRCUITS TO EXISTING 1000 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 63 . LIGHTING OUTLETS: 35. SPECIFIC LOCATION: TEMP POWER FOR 7 FLOOR RENOVATION. | JUN 23, 2026 | Active | $300,000 | Abco Electrical Construction & Design LLC |
101081181 Renovation | Phase 2 infrastructure upgrades to convert a seven-story office building to a data center, including floor structural reinforcement and electrical distribution from the vault to upper floors. | MAY 8, 2026 | Active | $51,100,000 | Arco/murray |
101083036 Renovation | DDS 2019 CBRC: DDS 2019 CBRC: PHASE 1 OF 3: DEMOLITION OF NON LOAD BEARING PARTITIONS ON BASEMENT, 1ST THROUGH 7TH FLOORS OF EXISTING OFFICE BUILDING AS PER PLANS. TO ALSO INCLUDE DEMOLITION WORK ON THE MECHANICAL PENTHOUSE. 1A CONSTRUCTION. B-BUSINESS CONSULTANT REVIEWER: V3 COMPANIES | MAY 8, 2026 | Active | $3,950,000 | Arco/murray |
Permit values are as reported at filing and may be revised on amendment. Individual permits can overlap in physical scope.
Why this project matters
COST
$51.1M largest permit, elevator equipment
Max reported cost; not a summed project total
ACTIVITY
5 permits in the last 90 days
3 major and 2 supporting permits on this site
TRADES
General Construction, Electrical, and Elevator opportunity on site
Multiple trade disciplines on linked permits
CONTRACTOR
Arco/murray is the linked general contractor
Named on 2 permits for this site
SCOPE
Elevator Equipment, elevator
Key parties
General Contractor
Arco/murray(331) 251-2726
(773) 826-2600
Mechanical
Ams Mechanical Systems Inc(630) 887-7700
Plumbing
Brandenburger Plumbing Inc(773) 779-8350
Owner
Legacy Gi Tc 400 Lasalle LLCNo contact on file
Architect
Krestel Christopher DNo contact on file
7 more parties on this project
Location
1 site · Chicago
Sources: City of Chicago Dept. of Buildings permit feed · Cook County Assessor parcel records
Source Chicago Building Permits · Last calculated Sep 8, 2026